AT LOGANSPORT, INDIANA:
256 10:11 ROADRAILER EASTBOUND
8983NS (C40-9W F)
8453NS (C40-8W R HORSEHEAD EX-LMS)
14E 1:36 FREIGHT EASTBOUND
9126NS (C40-9W F)
9017NS (C40-9W R)
35N 2:08 FREIGHT WESTBOUND
9351NS (C40-9W F)
8991NS (C40-9W F)
6748NS (SD60M R EX-CR)
260 2:39 ROADRAILER EASTBOUND
9554NS (C40-9W F)
8441NS (C40-8W R CR PAINT)
5511NS (GP38-2 R REBUILD)
***D99 3:09 LOACL EASTBOUND INTO YARD***
5199NS (GP38-2 F)
5108NS (GP38-2 R)
THIS WILL BE D93'S TRIAN ON MONDAY. THE WABASH WILL BE SHUTTING DOWN
MON-WED FOR 14HOURS TO DO BRIDGE WORK IN LAFAYETTE. THEY ARE REPLACING THE BALLASTED DECK ON THE BRIDGE APPROACHING EAST YARD.
15E 3:54 FREIGHT WESTBOUND
2549NS (SD70 F)
9715NS (C40-9W R)
21T 4:39 AUTORACKS & STACKS WESTBOUND
9627NS (C40-9W F)
2755NS (SD70M-2 R HORSEHEAD)
20T 5:19 STACKS EASTBOUND
2676NS (SD70M-2 F HORSEHEAD)
6740NS (SD60M R)
19K 5:49 FREIGHT WESTBOUND
9903NS (C40-9W F HORSEHEAD)
8412NS (C40-8W R CR PAINT)
255 6:33 ROADRAILER WESTBOUND
9095NS (C40-9W F)
9054NS (C40-9W R)
272, 122, AND 17K WERE COMING WHEN I LEFT.
TRIPLECROWN