8) There are two engines, eight cars, four loads, two empty flatcar spacers, two empty gons.
The last load, is a motor grader, following a pipelayer, following an unidentified load, following treated utility poles.
Since the poles have no bulkhead, there are two flatcar spacers.
A MOW project?
A high price movement of dedicated utility poles(FEMA), with heavy equipment added for extra revenue?
You mean like what this post shows?
http://jreb.org/ns/index.php?topic=5647.0
looks like an 054
8) Yes, I posted this before I found the other post...let's all go there (http://jreb.org/ns/index.php?topic=5647.0)...